Have your say on essential and future design works for the Lapstone Hill Tunnel

Have your say on essential and future design works for the Lapstone Hill Tunnel on Facebook Share Have your say on essential and future design works for the Lapstone Hill Tunnel on Twitter Share Have your say on essential and future design works for the Lapstone Hill Tunnel on LinkedinEmail Have your say on essential and future design works for the Lapstone Hill Tunnel link

09 Apr 2024

Survey closed.

Monday, 18 March 2024

Council is calling for community feedback on a series of essential upgrades and future design elements for the Lapstone Hill Tunnel.

Before the tunnel can be opened to the public, improvements to the tunnel’s drainage system need to be made, as well as the installation of lighting and electrical connections.

We are also calling on the community to consider:

  • How the cultural and heritage significance of the tunnel might be reflected.
  • Initial thoughts on a proposal for a bridge across Knapsack Gully near the western entrance of the tunnel.
  • Future opening and closing times for the tunnel.

This survey closed on Monday, 8 April 2024.

Following community feedback, installation of the drainage and lighting solutions, plus further minor repairs and remediation, is anticipated to be completed by the end of 2024.

Share Have your say on essential and future design works for the Lapstone Hill Tunnel on Facebook Share Have your say on essential and future design works for the Lapstone Hill Tunnel on Twitter Share Have your say on essential and future design works for the Lapstone Hill Tunnel on Linkedin Email Have your say on essential and future design works for the Lapstone Hill Tunnel link
<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>