Citywide Parking Scheme – Parking Precincts Plan

Share Citywide Parking Scheme – Parking Precincts Plan on Facebook Share Citywide Parking Scheme – Parking Precincts Plan on Twitter Share Citywide Parking Scheme – Parking Precincts Plan on Linkedin Email Citywide Parking Scheme – Parking Precincts Plan link

The public exhibition period for the Draft Parking Precincts Plan, that outlines Stage 2 high demand visitation sites for the Visitor Pay Parking project, is now closed.

These locations include:

  • Cahill's & Boar's Head Lookouts, Katoomba
  • Echo Point Precinct, Katoomba (expansion of existing plan)
  • Katoomba Falls
  • Gordon Falls, Leura
  • Leura Cascades
  • Wentworth Falls Lake
  • Falls Road adjacent to Wentworth Falls Lookout
  • Fletcher Street and Valley Road adjacent to Conservation Hut, Wentworth Falls
  • Lincoln's Rock, Wentworth Falls.

The Draft Parking Precincts Plan will guide parking infrastructure improvements with short, medium and long-term solutions.

Submissions closed on 17 July, 2023. The results of this consultation will be reported to the Council in September 2023.

Stage 2 is expected to be operational by late 2023 or early 2024. Read the News Feed section below for more information, or go to: www.bmcc.nsw.gov.au/parking-strategic-plan

The public exhibition period for the Draft Parking Precincts Plan, that outlines Stage 2 high demand visitation sites for the Visitor Pay Parking project, is now closed.

These locations include:

  • Cahill's & Boar's Head Lookouts, Katoomba
  • Echo Point Precinct, Katoomba (expansion of existing plan)
  • Katoomba Falls
  • Gordon Falls, Leura
  • Leura Cascades
  • Wentworth Falls Lake
  • Falls Road adjacent to Wentworth Falls Lookout
  • Fletcher Street and Valley Road adjacent to Conservation Hut, Wentworth Falls
  • Lincoln's Rock, Wentworth Falls.

The Draft Parking Precincts Plan will guide parking infrastructure improvements with short, medium and long-term solutions.

Submissions closed on 17 July, 2023. The results of this consultation will be reported to the Council in September 2023.

Stage 2 is expected to be operational by late 2023 or early 2024. Read the News Feed section below for more information, or go to: www.bmcc.nsw.gov.au/parking-strategic-plan

Page last updated: 23 Aug 2023, 04:07 PM